November 2025
Recap
- October was the genesis. First commit on the 24th. Portfolio template, basic structure. Two commits total but the project exists now.
Focus
- Full site build mode. 19 commits this month.
- Built the 404 page, blogroll grid, doc routing, Hetzner S3 integration for file storage.
- Dockerized the site. First deploy pipeline.
Projects
- krisyotam.com -- 404 page with unibody design, blogroll aesthetic grid, doc route replacing old doc.krisyotam.com, S3 file routing via Hetzner, Docker containerization, lexicon fixes.
Watching
- Chainsaw Man: The Movie -- Reze Arc (2025)
Avoiding
- News
- Anything that is not shipping the site
- Scope creep
No reactions yet