November 2025posted on 11.01.2025November 2025Recap October was the genesis. First commit on the 24th. Portfolio template, basic structure. Two commits total but the project exists now. Focus Full site build mode. 19 commits this month. Built the 404 page, blogroll grid, doc routing, Hetzner S3 integration for file storage. Dockerized the site. First deploy pipeline. Projects krisyotam.com -- 404 page with unibody design, blogroll aesthetic grid, doc route replacing old doc.krisyotam.com, S3 file routing via Hetzner, Docker containerization, lexicon fixes. Watching Chainsaw Man: The Movie -- Reze Arc (2025) Avoiding News Anything that is not shipping the site Scope creep No reactions yet
November 2025
Recap
Focus
Projects
Watching
Avoiding